Technical Presentation and 2026 AGM

Technical Presentation: Concept Optimisation of a Deep-Water Fixed-Bottom Offshore Wind Farm
Speaker: Lee Goulding, Technical Director, TWP
 

There are numerous viable concepts for developing an offshore wind farm such as Bowdun, encompassing variations in electrical configuration, substructure and foundation types, and turbine sizes. The success of the project depends on making well-informed decisions to identify the optimum concept for the construction, operation, and decommissioning phases of the wind farm.

Thistle Wind Partners will present its structured approach to determining the optimal development concept, carefully balancing safety, environmental, technical, supply chain, and economic considerations.

Lee Goulding

Technical Director, TWP

Find out more