The shipping industry is talking a lot about new technology trends, not least the impact of AI. But some of the most interesting conversations we are having right now take place on a more fundamental level; the cost of engineering. 

Engineering in a shipyard context has traditionally been treated as a cost centre to be managed. But when the main objective is to reduce the cost of engineering, this can also limit what it is able to contribute to the wider business. 

What happens if we look at it differently? Rather than seeing engineering as the problem, what if we asked how it can contribute and be an enabler to a shipyard project? 

Treating engineering as a business enabler, investing in the people, processes, information and technology that support it, means it can become a value creator. 

Getting ahead 

Good engineering does more than produce drawings and models. It can identify problems earlier, improve collaboration between engineering and production, reduce rework and give the shipyard more confidence that schedules and costs can be met. 

That ultimately means something very important in shipbuilding: better predictability. A more predictable idea of when the ship will be delivered, what the cost will be and what margin the shipbuilder will make. 

So where can engineering protect the shipyard’s margin? Some of it is obvious: a better process reduces wasted time, effort and money. 

But a lot of the value shows up somewhere else in the shipyard and often earlier in the production process. A clash found during engineering might take a few hours to resolve. The same clash found during production can mean delays to manpower, parts being changed, schedules moving and other work being disrupted. 

Multiple systems 

Among the biggest challenges that shipyards must manage is that building one ship may require using many engineering systems. Between contract signing and construction, the design can pass through several different CAD and engineering systems. 

The tool used during the early design phase may not be the same tool used for detailed engineering and production. Other stakeholders, partners and suppliers will often use their preferred legacy programmes. 

But every handover creates an opportunity for context to disappear. Passing a file from one system to another is relatively easy; keeping the meaning and relationships behind that information is much harder. 

The challenge is keeping the information connected - and correct - as the project moves from design into engineering and production. The production cycle does not care which CAD system created the model, it just needs the right information, in the right context, at the right time. 

Better relationships 

Shipbuilding is unique in manufacturing in that construction starts while engineering is still evolving. 

The impact comes from understanding the relationship between engineering and production. A drawing can be released, a model can be complete, but neither implies that all the decisions behind it have been made. 

There could still be open dependencies, missing supplier information or changes being worked through elsewhere. And when production starts before those things are understood, uncertainty moves downstream. Being finished and being ready are not always the same thing. Overcoming this challenge is understanding what change affects. 

Saving costs 

A change made early in the engineering process can mean adjusting a model or moving equipment. The same change made after material is ordered or production has started can mean major delays and disruption across the project. 

Suddenly the value of good engineering is easier to quantify because the cost saving from the problem that never reached the production floor can be seen in the delivery schedule. 

Viewed this way, we can see that engineering has a much bigger business impact than it typically gets credit for. Good engineering means fewer surprises and helps managers take decisions while there are still options available.  

Lifecycle impacts 

The later we understand the potential for disconnect between engineering and production, the more expensive the consequences can become. Effective change management therefore becomes about understanding impact early. The information created during design can also affect the vessel long after delivery, if the differences between ‘as designed’ and ‘as built’ are significant enough. 

Engineering influences far more than the design itself. It determines how early problems are identified, how effectively changes are managed and whether production teams have the information they need to keep work moving. Together, these factors can make the difference between a project that runs predictably and one that faces costly surprises.  

That requires good people and good engineering. But it also requires the processes and information infrastructure around them to work. When we understand that engineering influences far more than the design itself: how early problems are identified, how effectively changes are managed and whether production teams have the information they need to keep work moving, we can spend less time talking about the cost and more time about what it contributes to a successful project. 